Throttle Body Construction - Suzuki GSX1300R Manual

Suzuki gsx1300r motorcycle
Hide thumbs Also See for GSX1300R:
Table of Contents

Advertisement

1D-9 Engine Mechanical:

Throttle Body Construction

1. Fuel feed hose
2. ISC valve hose
3. PCV hose
4. IAT sensor
LH
(a)
" a"
4
5. EVAP purge control solenoid valve (E-33 only)
"A": To the IAP sensor
"B": To the EVAP purge control solenoid valve (E-33 only)
"C": To the canister (E-33 only)
FWD
" a"
" a"
"a "
2
3
5
1
"A"
"B"
B815H21406009
RH
"C"
I815H1140014-05
"a": Approx. 45°
: 1.5 N⋅m (0.15 kgf-m, 1.0 lb-ft)

Advertisement

Table of Contents
loading

Table of Contents