Throttle Body Construction - Suzuki GSX-R600 Manual

Hide thumbs Also See for GSX-R600:
Table of Contents

Advertisement

Throttle Body Construction

1. Intake pipe
2. Air cleaner outlet tube
3. EVAP system purge control solenoid valve
(E-33 only)
4. STVA sub cover
: Fit the cut part of the cover to the boss of
the throttle body.
5. IAT sensor
6. ISC valve hose
1
2
"A"
"A"
(a)
4
5
"D"
(b)
"E"
"A": Turn and tighten the #1 and #4 clamps after
tightening the #2 and #3 clamps.
"B": Face the clamp end backward. (E-33 only)
"C": Tighten the purge solenoid valve bracket and
EXCVA together. (E-33 only)
"D": Face the clamp end downward.
"E": White marking
"F": Evenly tighten the bolts in the order of "1" to "5".
Engine Mechanical:
3
"C"
"B"
"3"
"5"
"1"
"2"
"4"
6
"G"
"G": Pass the fuel pump lead wire
: 10 N⋅m (1.0 kgf-m, 7.0 lb-ft)
: 1.3 N⋅m (0.13 kgf-m, 1.0 lb-ft)
: 10 N⋅m (1.0 kgf-m, 7.0 lb-ft)
1D-9
B837H11406009
"F"
(c)
I837H1140304-05
above the fuel nipple.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents