13) Remove the fuel pipe protector LH.
14) Remove the engine harness from fuel injector
pipe LH.
15) Remove the bolts which hold fuel injector pipe
LH to cylinder head.
16) Remove the fuel pipe protector RH.
17) Remove the engine harness from fuel injector
pipe RH.
18) Remove the bolts which hold fuel injector pipe
RH to cylinder head.
Intake Manifold
19) Remove the bolts which hold intake manifold to
cylinder head.
• LH side
FU-02117
• RH side
FU-02118
20) Remove the intake manifold.
B: INSTALLATION
1) Install the intake manifold onto cylinder heads.
NOTE:
Use a new O-ring.
Tightening torque:
25 N
• RH side
FU-02119
FU-02120
FU(H6DO)-13
FUEL INJECTION (FUEL SYSTEMS)
⋅
m (2.5 kgf-m, 18 ft-lb)
FU-02121
FU-02122
FU-02122