▼ Connect Power Cords to the Server
●
Reconnect both power cords to the power supplies.
Note – As soon as the power cords are connected, standby power is applied.
Depending on how the firmware is configured, the system might boot at this time.
Related Information
"Power On the Server" on page 198
■
▼ Power On the Server
1. Verify that the power cord has been connected and that standby power is on.
Shortly after power is applied to the server, the SP OK/Fault LED blinks as the
service processor boots. The SP OK/Fault LED is illuminated solid green when the
service processor has successfully booted. After the service processor has booted,
the Power OK/LED on the front panel begins flashing slowly, indicating that the
host is in standby power mode.
2. Power on the server using one of the following steps:
■
■
-> start /SYS
When main power is applied to the server, the main Power/OK LED begins to
blink more quickly while the system boots and lights solidly once the operating
system boots.
The first time the server powers on, the power-on self-test (POST) executes and
can take several minutes to complete.
198
SPARC T3-2 Server Service Manual • December 2013
Press and release the recessed Power button on the server front panel.
Log in to Oracle ILOM and type:
Need help?
Do you have a question about the SPARC T3-2 and is the answer not in the manual?