Run Post With Maximum Testing - Sun Oracle SPARC T3-2 Service Manual

Hide thumbs Also See for SPARC T3-2:
Table of Contents

Advertisement

trigger = none
verbosity = min
Commands:
cd
set
show
->
Related Information
"POST Overview" on page 45
"ILOM Properties that Affect POST Behavior" on page 46
"Run POST With Maximum Testing" on page 49
"Interpret POST Fault Messages" on page 50
"Clear POST-Detected Faults" on page 51

▼ Run POST With Maximum Testing

This procedure describes how to configure the server to run the maximum level of
POST.
1. Access the ILOM -> prompt:
See
"Access the Service Processor (Oracle ILOM)" on page
2. Set the virtual keyswitch to diag so that POST will run in service mode.
-> set /SYS keyswitch_state=diag
Set 'keyswitch_state' to 'Diag'
3. Reset the system so that POST runs.
There are several ways to initiate a reset. The following example shows a reset by
issuing commands that will power cycle the host.
-> stop /SYS
Are you sure you want to stop /SYS (y/n)? y
Stopping /SYS
-> start /SYS
Are you sure you want to start /SYS (y/n)? y
Starting /SYS
24.
Detecting and Managing Faults
49

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC T3-2 and is the answer not in the manual?

Questions and answers

Table of Contents