Mitel 3300 Technician's Handbook page 144

3300 ip communications platform communications director release 5.0
Table of Contents

Advertisement

3300 ICP Technician's Handbook
6. Click Start Restore.
7. Click OK. The system will show an "in progress" message.
8. When the status window shows "complete", click OK.
9. Reset the controller (page 129). When the reset is complete, the
database is converted, and the system automatically resets.
-
If you have programmed Dimension Selection, the system reboots
automatically one more time.
Tip: While the System Administration Tool is restoring the database, no other
users can access any of the web-based tools. Users cannot access Visual
Voice Mail or save changes. We recommend performing restores outside of
business hours.
Verify the Restore
CAUTION: Do not reset any system components
(Controller, NSU, ASU, and so on) while executing the
following checks.
CAUTION: Rebooting the controller before the Analog Main
Board and Analog Options Board load can render the boards
inoperable.
1. Verify that one of the NSUs are loading. If they are, wait until they have
finished loading. To verify that L0/L1 LEDs are not marching, see
"Universal NSU LED States" on page 350 and "R2 NSU LED States"
on page 351.
2. Log into ESM (using the customer's username and password), then
click System Administration Tool and select Maintenance
Commands.
3. Issue the dbms stat maintenance command to check if the
DBMS_Initialized flag is ON. If it is, you'll see
DBMS info: DBMS_Initialized is ON
4. Issue the Type *.dr.logfile_1 maintenance command to display the
log file created during the Data Restore. Wait until the checks are
complete, then review the log to ensure there were no errors during
the restore procedure.
134

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents