12-2 NAC installation checklist

Software installation

553-4011-110 Standard 1.0 November 1994
Install the printers. Ensure that the settings are correct. For more
information, refer to the "Printers" section of the "Peripheral devices"
chapter.
Printer(s) installed ?
Install the workstations. Ensure that the PCs are configured and VDTs are
set up. For more information, refer to the "Peripheral devices" chapter,
"Workstations" section.
Workstation(s) installed ?
Connect the hardware to the power source(s) (do not power up the
hardware).
Power cable(s) installed ?
Connect all Modems, if required. For more information, refer to the
"Peripheral devices" chapter, "Modems overview" section.
Network link modem(s) installed ?
Limited
distance modem(s) installed ?
-
Remote diagnostic modem installed ?
Supervisor dial
up modem(s) installed ? _______________________
-
Hardware installation completed ?
Providing you have completed the hardware installation, proceed with the
software installation. If you performed a new software installation, refer to
the "New software installations" chapter. If you installed a more recent
issue of your existing software, refer to the "Loading a new software
release" chapter. If you performed a software re-installation or upgrade,
refer to the "Software re-installations and upgrades" chapter.
Software installed (if necessary) ?
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________

Advertisement

Table of Contents
loading

Table of Contents