Nac Installation Checklist; Nac Hardware Overview; Software Overview; New Installation - Northern Telecom NAC Installation Manual

Network administration center
Hide thumbs Also See for NAC:
Table of Contents

Advertisement

1-4 Introduction

NAC installation checklist

NAC hardware overview

Software overview

New installation

553-4011-110 Standard 1.0 November 1994
Changing the NAC system time
The "NAC installation checklist" chapter lists all of the steps to be followed
while installing a new NAC 2 system. Each step should be performed only
if all of the following conditions are met. Refer to the "NAC installation
checklist" chapter for more detailed information.
This document was read and understood fully by the personnel who are
performing the step.
All applicable preceding steps were completed and performed
correctly.
NAC 2 runs on the application module (AM) platform and consists of the
following components.
MVME167–34 33MHz CPU card with 32 Mbyte of memory
1.2 Gbyte Seagate ST11200N hard drive
600 Mbyte Teac tape drive
MVME332-XT boards (maximum of five)
application module generic I/O panel
Please read and follow the instructions as given in the "Software
installation overview" chapter of this document for your software
installation requirements.
The following is a list of the steps required to install software on a new
NAC 2 system.
1
Ensure the NAC hardware is installed properly.
2
Install the operating system and the NAC application software
(customer-installed software sites).
3
Start up the NAC system in Training Mode.
4
Train all users with the Training Mode.
5
Switch from Training Mode to Precutover Mode.
6
Set up the database while in Precutover Mode.

Advertisement

Table of Contents
loading

Table of Contents