NAC installation checklist

Site preparation

Hardware installation

This checklist provides you with a handy reference for installing your NAC
system. All items on the checklist correspond to sections and chapters of
this document. Be certain you read the document before proceeding with
any installation procedure.
Plan out the site for your system's hardware. Be sure to take into account
the power and environmental requirements. For more information refer to
the "Site preparation" chapter.
Site preparation completed ?
Read your peripheral equipment warranties and register them with the
appropriate individual. For more information refer to the "Hardware
installation" chapter, "A word about warranties" section.
Peripheral equipment warranties
registered ?
Install the NAC module. For more information, refer to the "Hardware
installation" chapter.
NAC module installed ?
Install the multiport cables. For more information, refer to the "Hardware
installation" chapter, "Cables" section.
Multiport cables installed ?
Network Administration Center (NAC) Installation Guide Product release 2
_______________________
________________________
_______________________
_______________________
12-1

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NAC and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents