Completing The Installation - Watts AERCO Edge [ii] Operation Manual

For benchmark boilers
Table of Contents

Advertisement

Edge [ii] Controller Operation Manual
SECTION 2: EZ SETUP
Enter the upper and lower limits of the "other" setpoint in the BST Other
Setpt Lo Limit and BST Other Setpt Hi Limit fields.
Pressing Next takes you to the Select BAS Mode screen; skip to

Completing the Installation

Figure 2.3.2.2.3-11: BST Manager – SH & Other: Other Analog Input Screen
B. If you chose Network, the Select BAS Mode screen appears. Proceed to the next
section,
Section 2.4: Completing the
2.4 Completing the Installation
Complete the instructions below to complete the installation. If the unit will communicate with a
BAS, you will select and configure the communicate protocol as well.
1. If the EZ Setup Complete screen appears, skip to Step 7.
2. If the unit will communicate with the site's BAS (Building Automation System), the Select
BAS Mode screen appears. Press the communication protocol it will use, or else press Off.
Press Next to continue.
OMM-139_E
8/25/2020
for instructions.
Installation, for instructions.
Figure 2.4-1: Select BAS Mode Screen
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
Section 2.4:
Page 55 of 196

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents