Edge [ii] Controller Operation Manual
SECTION 6 – ADVANCED SETUP
Figure 6.2.8-2: Unit: 24 Month Maintenance Screen
2. Either the 12 Month Maintenance or 24 Month Maintenance screen appears, depending
on which cycle is coming up next. On a new unit, the 12 Month screen appear first.
3. In the 12 Month Maintenance screen, once all 12-month maintenance tasks have been
completed set the toggle to Yes, enter your initials in the lower-left field, then press Save.
The Controller will reset the 12 Month Maintenance cycle.
4. In the 24 Month Maintenance screen, set each of the 24-month maintenance tasks that
have been completed to Yes, then enter your initials in the lower-left field.
5. When all tasks have been completed, press Complete (the Complete button doesn't
appear until all tasks have been completed). However, if any task is still set to No, you can
press Save to close this screen; the 24 Month calendar is not reset.
6. Return to this screen once all tasks have been completed.
7. Once all 24-month maintenance tasks have been completed, set all toggles to Yes, then
press Complete. The 24 Month Maintenance cycle is reset.

6.3 BST Cascade

The BST Cascade screen provides options to alter BST Cascade system settings.
Main Menu → Advanced Setup → BST
1. Go to:
Figure 6.3: Advanced Setting: BST Cascade Screen
2. All the options on this screen are greyed out (disabled) except Cascade Configuration until
BST Cascade functionality has been enabled (see Step 2 in the next Section).
OMM-139_E
8/25/2020
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
Cascade.