Ez Setup: Bst Manager - Dhw And Other Applications - Watts AERCO Edge [ii] Operation Manual

For benchmark boilers
Table of Contents

Advertisement

Edge [ii] Controller Operation Manual
SECTION 2: EZ SETUP
11. The Swing Boiler Settings screen appears. Configure the following parameters:
Figure 2.3.2.2.1-14: BST Manager – SH & DHW: EZ Setup Complete Screen
DHW Setup: Choose one:
o 2 Port Tank
o 4 Port Tank
o Indirect Tank
Default Swing Boiler Load: Choose one of the following:
o Swing Default SH
o Swing Default DHW
DHW Pump Unit Address: Enter the address of the unit containing the DHW
Pump. (Range: 1 to 16)
DHW Pump Control Type: Choose either Constant On or Controlled.
12. Once all DHW parameters have been configured, the Select BAS Mode screen appears.
Skip to
Section 2.4: Completing the Installation
2.3.2.2.2
EZ Setup: BST Manager – DHW and Other Applications
Complete these instructions only if you chose both DHW and Other at the end of Section 2.3.2.
Figure 2.3.2.2.2-1: BST Manager – DHW & Other: Select Your Boiler Application
OMM-139_E
8/25/2020
for instructions.
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
Page 47 of 196

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents