SECTION 2: EZ SETUP
3. The Select Configuration screen appears. Press Standalone. Press Next to continue.
Figure 2.2-2: Standalone: Select Configuration Screen
4. The Time And Date screen appears. If both are correct, press Next to continue. If not,
press either field and enter the correct time (requires 4 digits) or date (requires 8 digits) and
then press Save.
5. If a previous setup was performed and saved, the Load Settings screen appears. To re-
load that setup, press Yes and see
Press No to continue to the next step.
Figure 2.2-4: Standalone: Load Settings Screen
OMM-139_E
8/25/2020
Figure 2.2-3: Standalone: Enter Date Screen
Section 2.5: Restoring a Previous Setup