Demand; Auxiliary Delay Timers - Watts AERCO Edge [ii] Operation Manual

For benchmark boilers
Table of Contents

Advertisement

Edge [ii] Controller Operation Manual
SECTION 7 – UNIT STATUS

7.1.1 Demand

1. Upon a demand for heat, the Demand rectangle turns green, and, if the sequence has a
delay timer, those timers display appropriate values.
Figure 7.1.1: Ignition Sequence Step 1 – Demand
2. Upon expiration of the internal 4 second IGST Demand delay and the unit progresses to the
Auxiliary Delay sequence.

7.1.2 Auxiliary Delay Timers

1. Upon expiration of the internal 4 second IGST Demand delay, On Delay Timer starts,
followed by Auxiliary Delay Timer (if any). In both cases, the displays the count down.
Figure 7.1.2: Ignition Sequence Step 2 – Auxiliary Delay
2. When the On Delay Timer and all the interlock switches are closed, the Auxiliary Delay
rectangle turns green and the unit progresses to the Purging sequence.
If the interlock switches are closed and On Delay time has expired, the Auxiliary
Delay rectangle immediately changes to green, allowing for the purge cycle to begin.
If the any of the interlock switches are not closed when the auxiliary timer expires, the
Auxiliary Delay rectangle turns red and the correspond interlock fault is displayed.
OMM-139_E
8/25/2020
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
Page 169 of 196

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents