Installation - Comtech EF Data SLM-5650B Installation And Operation Manual

Table of Contents

Advertisement

The equipment contains parts and assemblies sensitive to damage by Electrostatic
Discharge (ESD). Use ESD precautionary procedures when touching, removing, or
inserting PCBs.
Step
Task
1
Keep all shipping materials for storage or reshipment.
2
Check the packing list to ensure the shipment is complete.
Inspect the equipment for any possible damage incurred during shipment.
3
Contact the carrier and Comtech EF Data immediately and submit a damage report if damage is evident to the
shipment.
4
Read the manual.
2.2

Installation

When installing the SLM-5650B into a rack enclosure (Figure 2-2):
PROPER GROUNDING PROTECTION IS REQUIRED. The equipment must be connected to
the protective earth connection at all times. It is therefore imperative that the unit is properly
grounded, using the ground stud provided on the unit rear panel, during installation,
configuration, and operation.
PROPER AIR VENTILATION IS REQUIRED. In a rack system where there is high heat
discharge, provide forced-air cooling with top- or bottom-mounted fans or blowers.
Make sure there is adequate clearance inside the enclosure, especially at the sides for
air ventilation.
Air temperature inside the rack enclosure should
For information about custom rack enclosures, contact Comtech EF Data Customer
Support, or visit Comtech EF Data's Web site (www.comtechefdata.com/support.asp).
Installation
never
exceed 50°C (122°F).
2–2
SLM-5650B Satellite Modem
Revision 2
MN-SLM-5650B

Advertisement

Table of Contents
loading

Table of Contents