INSTALLATION
MUFFLERS
Y28GCOA
1.
Temporarily install the front exhaust pipe, the catalytic con-
verter assembly, the center exhaust pipe, and the main
muffler, in that order.
2.
Install the rubber hangers so that they are identical (left and
right) in length.
3.
Tighten the parts securely, and then confirm that there is
no interference with any body components.
28-14