Hyundai Sonata 1991 Shop Manual page 186

Table of Contents

Advertisement

AUTOMATIC SPEED CONTROL (CRUISE)
SERVICE ADJUSTMENT PROCEDURES
ASC CABLE INSTALLATION AND ADJUSTMENT
To accele70r pedal
Adjusting bolts
Throttle stop
Pulley
attached to
throttle valve
Accelerator cable
(Throttle valve side)
Surge tank (Reverse
view shown for clarity)
Intermediate pulley C
(Actuator side)
~---
Actuator (Shown without
mounting bracket attached)
Intermediate Pulley B
(Throttle valve side)
(Insert
1.5
mm
shim
between both
stops on
assembly)
(I
I
I
'[/
'-""=:=:;
Accelerator Cable (Accelerator pedal side)
Y27EYOA
1.
With lock nut A at end of cable, assemble the accelerator
cable to the intermediate pulley
A.
Typical cable to pulley attachment
27-67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents