ASSEMBLING THE DISC MOWER (FACTORY-INSTALLED TRANSPORT)
3. Loosen jam nut (A) and fully loosen float spring bolt (B).
4. Place forklift forks under top beam (A) at opening (B).
Lift carrier frame slightly until pin at base of center-link
anchor is loose. Use a piece of wood to protect paint
on frame.
5. Remove four M10 hex head bolts (A) and flat washers,
and remove top shield (B).
CAUTION
To avoid injury, keep fingers clear of opening at base of
anchor.
214713
B
A
Figure 4.3: Float Spring
Figure 4.4: Carrier Frame
Figure 4.5: Top Shield (Left of Center-Link)
58
A
B
A
B
Revision A