Commissioning
6.7 Commissioning: Basic procedure
● "Remaining time until test stop"
This indicates the remaining time until dynamic operation and test of the safety switch-off
signal paths are performed (p9660).
● "Shutdown paths require testing"
Select the parameters to be interconnected with the status "Shutdown path test required"
(r9773.31). One or more interconnections are possible, but not mandatory.
● Click "Close" to return to the "Safety Integrated" dialog box.