Siemens Sinamics S120 Function Manual page 161

Hide thumbs Also See for Sinamics S120:
Table of Contents

Advertisement

Ex ecuting a forced checking procedure (test stop)
Forced dormant error detection (test stop) can be executed at the following points in time:
1. Forced dormant error detection (test stop) can be initiated application-specifically and can
therefore be executed at a time that suits application requirements.
This functionality is implemented by means of a single-channel parameter p9705, which
can be wired via BICO either to an input terminal on the drive unit (Control Unit) - or to a
bit of any arbitrary PZD.
In addition, it is possible to select the test stop via the Safety Control Channel (see
Chapter "Safety Info Channel and Safety Control Channel (Page 207)").
– p9559 SI Motion Forced checking procedure timer (Control Unit)
– p9705 BI: SI Motion Test stop signal source
– r9723.0 CO/BO: SI Motion diagnostics signals integrated in the drive
If the test stop is executed as described, the action does not require a POWER ON. The
acknowledgment is set by canceling the test stop request.
2. Forced dormant error detection (test stop) can be automatically executed at POWER ON.
– To perform an automatic test stop of the Safety Integrated Extended functions as well
– To perform automatic forced dormant error detection (test stop) of the F-DI and F-DO
– Even if you have parameterized forced dormant error detection (test stop) for POWER
– If the automatically initiated function cannot be correctly completed as a result of a
– After forced dormant error detection (test stop) has been performed successfully, the
– Timer p9559 is reset as a result of automatic forced dormant error detection (test
– Automatic forced dormant error detection (test stop) for POWER ON does not
In all cases, the scope of forced dormant error detection (test stop) function is identical.
Safety Integrated
Function Manual, (FHS), 07/2016, 6SL3097-4AR00-0BP6
as an automatic test of the F-DO for the CU310-2, set p9507.6 = 1.
When testing the F-DO of the CU310-2, you must parameterize p10042 and activate
the test in p10046.
Not e
A ut omatic f orced dormant error detection (test s top) and SBT
Automatic forced dormant error detection (test stop) of the Safety Integrated Extended
functions is possible together with the "Brake test for test stop selection" function
(p10203 = 2)
of the TM54F, set p10048 = 1.
ON, you can still initiate a test stop at any time through the application.
problem (e.g. communication failure), the function will be automatically restarted after
the problem has been resolved.
converter goes into the "Ready" state.
stop).
influence the Safety Integrated functions.
Description of Safety Integrated functions
4.2 Safety Integrated Extended Functions
161

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents