Quantum Data 881 User Manual page 369

Hide thumbs Also See for 881:
Table of Contents

Advertisement

8. Navigate to your PC and double click on the report. A sample is shown below.
Running the HDMI EDID Compliance using the Compliance
Controller
Follow the procedure below to run the EDID HDMI compliance test using the Compliance
Controller (available in release 2.18 or later). Prior to running this test you will need to
configure the 882 for the test. Refer to
"Setting up 882 for HDMI sink device EDID
compliance
testing" on page 16 for instructions on setting up the 882 for the EDID test.
882 Video Test Instrument User Guide (Rev A.35)
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

882

Table of Contents