17.
Install the cable from the optional external AC adapter (refer to
Figure 7-63 AC to DC In

Figure 7-63 AC to DC In Connection

The AC Adapter (AC-L UNIT) must be ordered separately.
18.
Cable installation for the GBA-L UNIT complete (refer to
7-64 GBA-L UNIT

Figure 7-64 GBA-L UNIT Installed

Connection).
Installed).
Installing SV8100 Optional Equipment