NEC Univerge SV8100 System Hardware Manual page 438

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 9.0
7 - 12
1.
Make sure the jumper in the PGD Adapter for the associated Door Box is
set correctly. (Refer to
7-4).
2.
If a line cord was not previously connected to the PGD Adapter,
complete Steps 3-6. Otherwise, skip to Step 7.
3.
Install a modular jack for each PGD Adapter. For each module, run one-
pair 24 AWG station cable from the cross-connect block to a modular
jack. Ground the unused pair.
4.
Terminate the extension leads to GRN/RED of the modular jack.
Terminate the unused leads to the jack.
5.
Install bridging clips as required.
6.
Plug a modular line cord from the mod jack to the CN1 connector on the
PGD Adapter.
7.
If wall mounting the Door Box, remove the screw on the front of the Door
Box.
8.
Remove the back half of the Door Box and attach this mounting bracket
to the wall with the two screws provided.
9.
Connect the two-conductor station cable from the CN4 connectors in the
PGD Adapter to the Door Box terminals. These wires must be routed
through the opening in the bottom of the Door Box mounting bracket.
Be sure to maintain the proper polarity.
10.
Replace the front half of the Door Box and reattach the screw to secure it
in place.
11.
To connect a Door Box to an external relay for an unlock device, for
example, connect one-pair 24 AWG station cable from the Relay 5 (for
Door Box 1) or Relay 6 (for Door Box 2) connectors (CN5) in the PGD
Adapter. Connect the opposite end to the unlock device.
Refer to External Page and Door Box/Page Relays on page 7-18 for additional
information when using the CD-CP00 relay.
Figure 7-4 PGD Adapter Jumper Settings on page
Installing SV8100 Optional Equipment
UNIVERGE SV8100

Advertisement

Table of Contents
loading

Table of Contents