Section 1 General Information; Installing The Chassis; Unpacking The Equipment; Before Installation - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Installing the SV8100 Chassis
G
S
1
ENERAL
ECTION
This chapter contains information to help the technician install the chassis
for the SV8100 system. The technician should be familiar with this section
before installing any equipment.
I
S
2
NSTALLING THE
ECTION
2.1
2.2
System Hardware Manual
I
NFORMATION
C
HASSIS

Unpacking the Equipment

Inspect the equipment for any physical damage. If you are not sure
about the function of a component, review the associated
information within this manual. Contact your authorized NEC Sales
Representative if you have additional questions. Note that the
chassis does not initially contain any blades.
Make sure you have appropriate tools for the job, including: a test
set, a punch down tool, and a digital voltmeter.
Ensure that you have a building plan showing common equipment,
extensions, the Telco demarcation and earth ground location
before you start installation. Be sure to properly plan your
installation site and that you are familiar with the installation safety
precautions.

Before Installation

Before installing the chassis check the following:
Ensure that the MPS7101(Power Supply Unit) is OFF and that
the power cord is disconnected from the AC outlet.
When installing the blades, do not touch the soldered surfaces
as this may cause damage.
Determine the type of mounting (wall, floor, stand or rack) to be
used.
Chapter
3
3 - 1

Advertisement

Table of Contents
loading

Table of Contents