Installation; Led Indications; Table 4-51 Cd-Rtb Led Indications - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 9.0
4 - 114
The PZ-IPLA/IPLB, required for IP telephones to communicate with
non-VoIP UNIVERGE SV8100 telephones, and to place or receive
outside calls, must be connected to either an external switching hub
or to the Router blade.
The blade plugs into a universal slot and does not consume any port.
Each blade provides eight RJ-45 port connectors. These connect to
LAN terminals. Depending on the type of LAN terminal, the blade
may not detect the difference between straight cable and crossover
cable automatically. If auto-crossover is not functioning, use straight
cable for that terminal connection.
Refer to the following table for maximum upgrade capacities of the
CD-RTB blade:
Table 2-4 SV8100 Maximum 9.5" Gateway and 19" System Capacities
– Blades on page 2-9
The Router blade can provide power also over Category 5 network
cables. This eliminates installing separate power adapters for each
IP telephone and allows centralized power backup.
6.3.2

Installation

To install the CD-RTB:
1.
Plug the CD-RTB blade in any universal slot.
2.
Refer to the Univerge SV8100 Programming Manual for
required programming.
6.3.3

LED Indications

LED indications for the CD-RTB are indicated in
LED
Indications. Each LED is listed with its associated function and
LED and Operational status. Refer to
page 4-112
LED
Function
CN2, CN3
LAN
LINK/ACT
Operation
Status
for the location of the LEDs on the blade.

Table 4-51 CD-RTB LED Indications

LED Status
Green On
Green
Flashing
Green Off
UNIVERGE SV8100
Table 4-51 CD-RTB
Figure 4-51 CD-RTB Blade on
Operation
Comments
Status
Link Established
Individually for
Ports 1~8
Communicating
Individually for
Data
Ports 1~8
Not Activated
Individually for
Ports 1~8
Installing the SV8100 Blades

Advertisement

Table of Contents
loading

Table of Contents