Issue 9.0
7 - 8
Figure 7-7 PGD Adapter Connections
9.
Install a modular jack for each PGD Adapter. For each module, run one-
pair 24 AWG station cable from the cross-connect block to a modular
jack. Ground the unused pair.
10.
Terminate the extension leads to GRN/RED of the modular jack.
Terminate the unused leads to the jack.
11.
Install bridging clips as required.
For the module to ID correctly, set the circuit type to 0 for the port in Program
10-03-01 prior to connecting the line cord.
12.
Plug a modular line cord from the mod jack to the CN1 connector on the
PGD Adapter.
UNIVERGE SV8100
Installing SV8100 Optional Equipment