Connectors; Table 4-32 Pz-4Lca/Pz-8Lce/ Rj-61 Cable Connector Pin-Outs - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100
System Hardware Manual
To install the PZ-4LCA
1.
Four plastic spacers are Included with the PZ-4LCA/PZ-8LCE.
Install the plastic spacers on either the CD-4LCA or CD-8LCA.
Make sure to attach the spacers so that they extend out on the
side of the daughter board which has the CN1 connector.
Refer to
page 4-64
Board on page
2.
Position the PZ-4LCA
connector on the CD-4LCA/CD-8LCA blade. Press the blade
and board together, ensuring the plastic spacers lock in place.
Refer to
page 4-64
Board on page
3.
Install the CD-4LCA/CD-8LCA blade in the slot in the chassis.
4.4.3

Connectors

Table 4-32 PZ-4LCA/PZ-8LCE/ RJ-61 Cable Connector Pin-Outs

show the pin-outs for the RJ-61 connector.
PZ-4LCA Daughter Board on page 4-64
the PZ-8LCE Daughter Board on page 4-65
connectors on the PZ-4LCA
Table 4-32
PZ-8LCE – CN2 (ports 9~12), CN3 (ports 13~16)
/
:
PZ-8LCE
Figure 4-29 Installing the PZ-4LCA Daughter Board on
and
Figure 4-30 Installing the PZ-8LCE Daughter
4-65.
/
PZ-8LCE CN1 connector over the CN4
Figure 4-29 Installing the PZ-4LCA Daughter Board on
and
Figure 4-30 Installing the PZ-8LCE Daughter
4-65.
/
PZ-8LCE daughter boards.
PZ-4LCA/PZ-8LCE/ RJ-61 Cable Connector Pin-Outs
RJ-61 Cable Connector –
PZ-4LCA – CN2 (ports 9~12)
Pin No.
Figure 4-29 Installing the
and
Figure 4-30 Installing
show the location of the
Connection
1
T4 (Tip for port 4)
2
T3 (Tip for port 3)
3
T2 (Tip for port 2)
4
R1 (Ring for port 1)
5
T1 (Tip for port 1)
6
R2 (Ring for port 2)
7
R3 (Ring for port 3)
8
R4 (Ring for port 4)
Issue 9.0
4 - 67

Advertisement

Table of Contents
loading

Table of Contents