Capacity Confirmation Of The Project Data Downloading Location - Mitsubishi GOT1000 GT15 User Manual

Graphic operation terminal
Hide thumbs Also See for GOT1000 GT15:
Table of Contents

Advertisement

Version confirmation of BootOS by rating plate

13.1.4 Capacity confirmation of the project data downloading location

When download the project data, confirm the capacity of the user area in the drive to which transferred, the
transferred project data size, the transfer size and buffering area size of the optional function OS in advance
to judge whether to carry out the download.
The capacities can be confirmed by GT Designer3 or GT Designer2.
Refer to the following for details.
• GT Designer3 Version1 Screen Design Manual (Fundamentals)
(7.5.2 Drive capacity required for data transfer)
• GT Designer2 Version
(8.1.2 Drive capacity required for data transfer)
Confirm the version of BootOS installed in the GOT at product shipment by rating
plate of GOT rear face.
GRAPHIC OPERATION TERMINAL
MODEL
GT1575-VTBA
IN 100V to 240V AC 50/60 Hz
POWER MAX 90VA
SERIAL
00004701
AA00001-A
MITSUBISHI ELECTRIC
MADE IN JAPAN
BACKLIGHT
GT15-70VLTT
Basic Operation/Data Transfer Manual
13.1.4 Capacity confirmation of the project data downloading location
A A
BootOS version
(In case that the BootOS is two digits,
only the first digit is written.)
13.1 Data Storage Location
9
10
11
12
13
14
15
16
13
- 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Got 1000Gt15

Table of Contents