(c) For other bus connection cables
• Wind cable shield material around the cable, and pull out the grounding braided wire of the
cable shield material with the length shown below.
• Attach the ferrite core to the cable in the position as illustrated below and insert the braided
wire for grounding into the ferrite core.
GOT side
80
(3.15)
40 or less
(1.57)
(2) CPU direct connection and computer link connection
• Peel the sheath (with the length shown below) of the cable to expose the shield braided wire for
grounding. (For grounding with cable clamps (refer to Section 5.4.3))
(a) For RS-232 cable
GOT side
230 or less
(9.06)
(b) RS-422 cable (For AC30/100/300R4-25P)
GOT side
230 or less
(9.06)
5.4 Precautions for Wiring/Connecting the EMC Directive-Compliant Product
Ferrite Core
(ZCAT3035-1330)
Cable shield material
Grounding braided wire
(200mm (7.87 inch))
Grounding braided wire
(50mm (1.97 inch))
40
(1.57)
40
(1.57)
80
(3.15)
40 or less
(1.57)
PLC side
PLC side
5.4.2 Processing connection cables
PLC side
Unit : mm (inch)
Unit : mm (inch)
Unit : mm (inch)
5
- 19
1
2
3
4
5
6
7
8