Mitsubishi GOT1000 GT15 User Manual page 157

Graphic operation terminal
Hide thumbs Also See for GOT1000 GT15:
Table of Contents

Advertisement

6
Mount the network unit (A9GT-QJ71LP23 or A9GT-QJ71BR13) or CC-Link communication unit (A8GT-
J61BT13) to GT15-75IF900.
7
Fasten the unit fixing brackets (3 places) with tightening torque of 0.36 to 0.48N·m.
4
MELSECNET/H communication unit, CC-Link IE Controller Network communication
unit, CC-Link IE Field Network communication unit, CC-Link communication unit
(GT15-J61B13)
(1) Unit installation
1
Power OFF the GOT.
2
Remove the two extension unit covers of the GOT rear face.
8.1 Communication Unit
8.1.2 Installing procedure
1
2
3
4
5
6
7
8
8
- 11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Got 1000Gt15

Table of Contents