Site Status; Deviations And General Status - Avaya Media Processing Server 500 Hardware Installation And Maintenance

Table of Contents

Advertisement

MPS System Checklist and Report
Date Notified:

Site Status

Was a Preinstallation Site Survey completed prior to this installation? □ Yes □ No
Was a Site Readiness Checklist received prior to the scheduling of this installation? □ Yes □ No
Who signed the Site Readiness Checklist form?
When was it received?
If the Preinstallation Site Survey and the Site Readiness Checklist were completed, note any
deviations or uncompleted items at the time of the installation:
Was a customer PO# and bill issued to cover the costs? □ Yes □ No

Deviations And General Status

List the deviations in the space provided below. Be sure to include any D.O.A. parts, parts that failed
during installation, improperly configured items, any required hardware not listed on the SDP,
incorrect cables or connections, and so on.
What could have been done on this installation to make it more productive and easier to install for
you or the customer?
Avaya Media Processing Server 500 Hardware Installation and Maintenance
206
Comments? infodev@avaya.com
October 2014

Advertisement

Table of Contents
loading

Table of Contents