Generator Installation - Mazda B-Series 1997 Workshop Manual

Table of Contents

Advertisement

CHARGING SYSTEM
Installation Note
Generator
1. Install the generator
Tightening torque:
40-54
N.m (4.1-5.5
kgfem, 3 0 4 0 ft-lbf)
2.
Connect Terminal B wire.
Tightening torque:
9.0-1 2.0 N.m (0.91-1.22
kgf-m, 6.6-9.0
ftdbf}
3. Connect the harness connector to the voltage regulator 1
brush holder assembly.

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents