Transmission Disassembly - Mazda B-Series 1997 Workshop Manual

Table of Contents

Advertisement

TRANSMISSION
J1
DISASSEMBLY
Precaution
1.
Clean the transmission exterior thoroughly with a steam cleaner or cleaning solvent before disassembly.
2.
Clean the removed parts (except sealed bearings) and all sealing surfaces with cleaning solvent, and dry
with compressed air.
3.
Clean out all holes and passages with compressed air, and check that there are no obstructions.
4. Wear eye protection when using compressed air to clean components.
Transmission
1. Remove the shift lever boot and gear shift lever, if necessary.
2. Remove the control case.
3. Remove the rear seal if necessary, referring to Disassembly Note. (Refer to page J1-8.)
4. Remove the extension housing, referring to Disassembly Note. (Refer to page J I -8.)
5. On 4x2 models, remove the anti-spill oil seal from the secondary shaft.
6. On 4x2 models, remove the speedometer drive gear and steel ball.
7. Disassemble in the order shown in the figure, referring to Disassembly Note.

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents