Fig. 37
Operation
manual holder
Adhesive
tape
Ventilation
duct
(2) Put the Cleaning instruction label on the top of
RADF (Fig. 38).
Fig. 38
Cleaning instrucion label
10 mm
12. Install the Working table.
(1) Open the Right upper cover and remove 2
screws securing the Upper cover (Fig. 39).
Fig. 39
(2) Secure the Working table with the Upper cover
to the Main body with 2 truss head screws (M4
x 14). Then cover the screw holes with 2 caps
(Fig. 40).
Fig. 40
13. Extend the Adjuster feet and adjust each length
with the spanner to make the Main body level with
the floor (Fig. 41).
Fig. 41
14. Put the Operation sheet on the Operation panel.
VI. Operation Check
1. Set the paper in the Trays and take sample copies.
2. Inspect the copy quality with the test chart fed from
the RADF.
Check items:
Centering, Skew, Leading edge timing etc.
Adjustment:
Refer to the Service Handbook.
screws
VII. Setting the KRDS
Refer to the Service Handbook.
Right
upper
cover
E-10
Caps
Truss head
screws
(M4 x 14)