Installing Memory Modules; Preliminary Steps - Fujitsu PRIMERGY CX2550 M2 Upgrade And Maintenance Manual

Table of Contents

Advertisement

7.2

Installing memory modules

I
If liquid cooling is installed, first prepare the memory modules as
described in section
page
199.
Upgrade and Repair Unit
(URU)
Tools: tool-less
7.2.1

Preliminary steps

Perform the following procedures:
"Disabling SVOM boot watchdog functionality" on page 54
Ê
Ê Locate the desired server node.
"Shutting down the server node" on page 39
Ê
Ê If applicable, remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 40
Ê
Ê Disconnect the SATA cable(s) from the connectors on the system board
described in section
the chassis.
"Removing the memory slot air ducts" on page 48
Ê
Ê Identify the correct memory slot according to the mounting order described
in section
"Memory sequence" on page
CX2550 M2
"Cooling pads on the memory modules" on
"Cabling for HDD 2.5"" on page
Upgrade and Maintenance Manual
Hardware: 5 minutes
208, and take it out of
118.
Main memory
121

Advertisement

Table of Contents
loading

Table of Contents