Replace the Septum
OPERATING SEQUENCE
Replace the Septum
Materials needed
•
•
•
WARNING! This operation must be carried out at low temperature to avoid burns. Therefore,
before beginning the sequence, the injector must be cooled to room temperature.
PRECAUTIONS
1. While in stand-by condition, press OVEN to
access the oven control table.
2. Scroll to
and press OFF.
Temp
3. Press RIGHT INLET.
and press OFF.
4. Scroll to
Temp
Maintenance and Troubleshooting Manual
Non metallic sharp tool
Septum (P/N 313 132 25)
Tweezers
OVEN
Temp
Initial time
Ramp 1
RIGHT INLET (PTV)
Temp
Pressure
Mode
Chapter 9
Maintaining a PTV Injector
.
50
50 <
1
10.0
50
50 <
100
100
split
147