19.4.1. Display method
Check the [Display] tab → [Operation panel] of the ribbon to display it. Please remove the check if you want to
hide it.
Caution
It can not be displayed unless the operation panel has been activated
at least once.
After the project is connected, the operation panel check box on the ribbon will not be valid unless the
operation panel has been activated at least once.
Projects that have never been launched on the Operations Panel will not be added to the RC dropdown.
19-481
Figure 19-17 Operation panel of docking window
Switching the connected project
19-481