Copying Programs Between Projects - Mitsubishi Electric MELFA FR CR800 Series User Manual

Industrial robots
Table of Contents

Advertisement

Memo
It is possible to change the display order
It is possible to change the display order of the projects in the tree.
Drag the project with the mouse, and drop it at the transportation destination. The project will
move to the top of the dropped project.

8.15. Copying Programs Between Projects

Use program management to copy or move a created robot program to another project. For details on the operation
method, see "11.13 Program Management", "11.13.2 Copy", or "11.13.3 Move".
It is possible to copy by drag and drop the project name in the project tree.
Please refer to "11.13 Program Management" in this manual for details.
8-89
Drag and drop
of the projects in the tree.
8-89

Advertisement

Table of Contents
loading

Table of Contents