4. Wipe off the excess grease.
Toe Control Link Ball Joint Installation Note
1. Install the toe control link ball joint so that the ball joint stud projection is within -2 4 mm {-
0.08 0.15 in} .
TOE CONTROL LINK INSPECTION
1. Remove the toe control link from the vehicle.
2. Inspect the lateral link for bending or damage. If there is any malfunction, replace the lateral link.
3. Inspect the ball joint for looseness. If there is any malfunction, replace the ball joint.
4. Rotate the ball joint 5 times .
5. Install the SST to the ball stud, and measure the ball joint rotational torque using a pull scale.
Toe control link ball joint rotational torque
0.32.2 N·m {422 kgf·cm, 319 in·lbf}
o
Pull scale reading: 322 N {0.32.2 kgf, 0.74.9 lbf}
o
If not within the specification, replace the toe control link.
•
(w)
RX-8 Suspension
Page 39