Installing The Control; Mounting The Control Cabinet; Installing The Cabinet Lock; Figure 4-1: Installing The Lock - ADEMCO VISTA-128B Installation And Setup Gude

Partitioned security system with scheduling
Hide thumbs Also See for VISTA-128B:
Table of Contents

Advertisement

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
In This Section

Mounting the Control Cabinet

Installing the Cabinet Lock

Grade A Mercantile Premises Listing
Grade A Mercantile Safe and Vault Listing
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Mounting the Control Cabinet
Mount the control cabinet to a sturdy wall using fasteners or anchors (not supplied) in a
clean, dry area which is not readily accessible to the general public. The back of the
control cabinet has 4 holes for this purpose.
Before mounting the circuit board, remove the metal knockouts for the wiring entry that
you will be using. DO NOT ATTEMPT TO REMOVE THE KNOCKOUTS AFTER THE
CIRCUIT BOARD HAS BEEN INSTALLED.
Installing the Cabinet Lock
Use an ADEMCO No. N6277 Cam Lock and No. P3422-2 Clip for universal commercial
cabinet.
To install the cabinet lock, perform the
following steps:
Step
1
2
Action
Insert the key into the lock.
Position the lock in the hole
making certain that the
latch will make contact
with
the
latch
bracket
when the door is closed.
While
holding
the
steady, insert the retainer
clip into the retainer slots.

Installing The Control

Installing the Control's Circuit Board
AC Transformer and Battery
Panel Earth Ground Connections
LOCKED
lock
CABINET DOOR BOTTOM

Figure 4-1: Installing the Lock

S E C T I O N
RETAINER CLIP
(NOTE POSITION)
RETAINER
SLOTS
RETAINER
CLIP
UNLOCKED
4
4-1

Advertisement

Table of Contents
loading

Table of Contents