Installing The Control; Mounting The Control Cabinet; Installing The Cabinet Lock - ADEMCO VISTA-100 Isntallation Instructions And Programming Manual

Commercial fire and burglary partitioned security system with scheduling
Hide thumbs Also See for VISTA-100:
Table of Contents

Advertisement

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
In This Section

Mounting the Control Cabinet

Installing the Cabinet Lock

Grade A Mercantile Premises Listing
Grade A Mercantile Safe and Vault Listing
Installing the Control's Circuit Board
Connecting the AC Transformer and Battery
Panel Earth Ground Connections
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Mounting the Control Cabinet
• Mount the control cabinet to a sturdy wall using fasteners or anchors (not supplied) in a
clean, dry area which is not readily accessible to the general public. The back of the
control cabinet has 4 holes for this purpose.
• Before you mount the circuit board, remove the metal knockouts for the wiring entry that
you will be using. DO NOT ATTEMPT TO REMOVE THE KNOCKOUTS AFTER THE
CIRCUIT BOARD HAS BEEN INSTALLED.
Installing the Cabinet Lock
Use an ADEMCO No. N6277 Cam Lock and No. P3422-2 Clip for a universal commercial
cabinet.
To install the cabinet lock, take the following
steps:
1. Insert the key into the lock. Position the lock
in the hole on the cabinet, making certain
that the latch will make contact with the
latch bracket when the door is closed.
2. While holding the lock steady, insert the
retainer clip into the retainer slots.

Installing The Control

Figure 4-1. Installing the Lock
S E C T I O N
RETAINER CLIP
(NOTE POSITION)
LOCKED
RETAINER
SLOTS
RETAINER
CLIP
UNLOCKED
CABINET DOOR BOTTOM
4
4-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents