Programming Power And Ac Options; Figure 18-1: 1321 Transformer And Battery Connections; Figure 18-2: 4300 Transformer Connections - ADEMCO VISTA-128B Installation And Setup Gude

Partitioned security system with scheduling
Hide thumbs Also See for VISTA-128B:
Table of Contents

Advertisement

PRIMARY
POWER
Supplied by a
transformer which
is rated at
16.5VAC, 40VA.
Caution must be
taken when wiring
this transformer to
the panel to guard
against blowing the
fuse inside the
transformer (non-
replaceable).

Programming Power and AC Options

Program the following data fields:
*17 AC POWER LOSS KEYPAD SOUNDING (1=yes; 0=no)
*19 AC RANDOMIZE (1=randomize; 0=no)
*28 POWER UP IN PREVIOUS STATE (1=yes; 0=no)
If you need more information about actual programming procedures, see The Mechanics of
Programming section .
Connect to
12VDC, 4AH
or 12VDC, 7AH
GEL CELL
BATTERY
CHARGING
VOLTAGE
13.7 VDC
TRANSFORMER
ADEMCO No.1361
NOTE:
or 4300, XM10E, or
WHEN POWERING UP
XF10 if X-10 DEVICES
THE PANEL, PLUG THE
WILL BE USED.
TRANSFORMER IN BEFORE
CONNECTING THE BATTERY.

Figure 18-1: 1321 Transformer and Battery Connections

4300 TRANSFORMER/INTERFACE
Earth
AC
Ground AC
SyncData Com
1
2
4
3
5
TB1
TB1
TB1
-1
-30
-2

Figure 18-2: 4300 Transformer Connections

BATTERY
TABS
1
2
3
Connect to
24hr. source
of AC mains
16.5VAC, 40VA
1 2 3 4 5 6 7 8 9
6
Section 18 – Final Power-Up Procedure
J8 CONNECTOR
4142TR CABLE
18-3

Advertisement

Table of Contents
loading

Table of Contents