Selecting The Site - Canon iR105 Service Manual

Hide thumbs Also See for iR105:
Table of Contents

Advertisement

1 Selecting the Site

The site of installation must meet the following requirements; if possible, visit the user's
before delivery of the machine:
1. The site must provide with a power outlet that is rated to suit the machine and that can
be used exclusively by the machine; 200V Model (180 to 220V, 12A or more), 208V
Model (188 to 228V, 12A or more), 230V Model (198 to 264V, 13A or more).
2. The site must be between 15° and 30°C in temperature and between 5% and 80% in hu-
midity. Particularly, be sure to avoid areas near water faucets, water boilers, humidifiers,
and refrigerators.
3. The site must not be near a source of fire, subject to dust or ammonium gas, or exposed
to direct rays of the sun. As necessary provide curtains.
4. The level of ozone generated by the machine will not affect the health of individuals
around it. Some, however, may find its odor unpleasant as while remaining in contact
with it for long hours. Be sure that the room is well ventilated.
5. Make sure that the feet of the machine will remain in contact with the floor, and the ma-
chine will be kept level.
6. Make sure that the machine will be at least 10 cm away from any walls, allowing
enough space for work.
COPYRIGHT© 2001 CANON INC.
2000 2000 2000 2000
CANON iR105 REV.0 JULY 2001
CHAPTER 4 INSTALLATION
4-1

Advertisement

Table of Contents
loading

Table of Contents