Replacing or adding voice processing boards
Figure 26: MPB96 board
Replacing MPB96 boards
This section describes how to replace an MPB96 board.
You will need to replace an MPB96 board:
• if the board becomes faulty
• when the PCI firmware needs to be updated, and the board must be sent back to the
factory
Caution:
Risk ofelectrical damage
• Wear an antistatic ESD wrist strap when handling cards or boards, or when working
inside the server.
• Do not touch the components or gold-edge connectors of cards or boards.
• Place the board on an antistatic surface until you are ready to install it.
142
Avaya CallPilot® 703t Server Maintenance and Diagnostics
December 2010