FUEL SYSTEM (Programmed Fuel Injection)
Install the three collars and starter valve shaft.
Install the starter valve assembly into the valve hole
Tighten the starter valve lock nut t o the specified
torque.
TORQUE:
Compress the thrust spring and install the No.3/4
starter valve arm onto the starter valves.
Install and tighten the starter valve arm mounting
screws t o the specified torque.
TORQUE:
5-78
2 N - m (0.18 kgf-m, 1.3 Ibf-ft)
1 N - m (0.09 kgf-m, 0.7 Ibf-ft)
COLLARS