Connect the servo motor 6P (Natural) connector.
EGCV
OPERATING INSPECTION
Disconnect the EGCV control cables (page 2-15).
Turn the EGCV pulley f r o m 0 t o 180" and check for
smooth operation.
If operation is not smooth, check for carbon deposits
i n the EGCV and valve body (page 5-99).
Check the EGCV pre-load using a torque wrench.
PRE-LOAD:
0.34
If pre-load is excessive, disassemble and
EGCV.
REMOVAL
Remove the exhaust pipe assembly (page 2-13).
Remove the bolts, front exhaust pipe and gasket.
(0.035 kgf-m, 0.25 Ibf-ft) maximum
FUEL SYSTEM (Programmed Fuel Injection)
i
FRONT EXHAUST PIPE
,
\
B
0
LTS
5-97