Removing The Cr Motor / Pulley Assy - Epson StylusPro 10000 Service Manual

Table of Contents

Advertisement

EPSON Stylus Pro 10000/10000CF

4.2.3.8 Removing the CR Motor / Pulley ASSY

1.
Remove the R Side Cover as described in "R Side Cover Removal 124.
2.
Remove the L Side Cover as described in "L Side Cover Removal 124.
3.
Remove the cable connector of the CR Motor (Lock type).
Figure 4-112.
Before loosening the CR timing belt tension, confirm and write down
the current tension. See "CR Timing Belt Tension Adjustment" for
information on confirming the tension.
Disassembly & assembly
Connector
4.
Loosen the CR Tension shaft on the right side of the printer to release the tension on
the CR Steel belt. (Loose two screws with same amount.)
5.
Loosen the set screw on the shaft clamp.
Disassembly Flow
Screw
CR steel belt
Figure 4-113.
Shaft clamp
Set screw
Figure 4-114.
Revision A
Pullry
163

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents