System Installation - Barco ScreenPRO-II User Manual

Hide thumbs Also See for ScreenPRO-II:
Table of Contents

Advertisement

3. Hardware Installation
póëíÉã=fåëí~ää~íáçå
This section provides instructions for installing your ScreenPRO-II Controller system. If
required, use the two previous sample system diagrams for reference:
You will need one (or more) of the items listed below:
Table 3-19. Equipment List, ScreenPRO-II Controller System
Qty.
Item
1
ScreenPRO-II Controller chassis
1-4
ScreenPRO-II
1-4
Video projector
1-4
Analog monitor(s)
1-4
Analog or digital monitor(s)
1
Ethernet hub or switch
TBD
Ethernet cables
TBD
Video cables
1
Analog router
1
Digital router
1
BlendPRO-II
TBD
Discreet analog sources
TBD
Discreet digital sources
TBD
PC(s), Mac(s)
TBD
DA(s)
Use the following steps to install ScreenPRO-II Controller:
1.
2.
3.
4.
ScreenPRO-II Controller • User's Guide
Refer to "
Figure 3-1
" on page 58 for an illustration of a Sample System with
External Routing .
Refer to "
Figure 3-2
" on page 62 for an illustration of a Sample System with
Internal Routing .
Required
Required, quantity based on production and screen requirements
Required, quantity based on single or widescreen requirements
Preview, quantity based on single or widescreen requirements
Program, quantity based on single or widescreen requirements
Customer supplied
Customer supplied
Customer supplied (Genlock, Genlock Loop, Widescreen Lock)
Required for systems configured for external routing
Required for systems configured for external routing
Required for systems configured for widescreen blends
Required for systems configured for internal routing
Required for systems configured for internal routing
Required for BG and DSK DVI sources, and discreet RGB sources
Required for signal distribution, when internal routing utilized
Follow the unpacking procedures as listed in the "
section on page 54.
As required, refer to the "
Physical and Electrical Specifications
page 258 in Appendix A for electrical and mechanical details.
As required, refer to the "
ScreenPRO-II Controller Rear Panel
page 32 in Chapter 2 for the locations of all connectors.
If you are rack mounting peripheral equipment such as the BlendPRO-II and
MatrixPRO routers, follow the rack mount procedures as outlined in each
individual User's Guide.

System Installation

Note
Unpacking and Inspection
" section on
" section on
"
73

Advertisement

Table of Contents
loading

Table of Contents