Barco ScreenPRO-II User Manual page 273

Hide thumbs Also See for ScreenPRO-II:
Table of Contents

Advertisement

9.
10. To upload files to ScreenPRO-II Controller, click " Open script file to read and
11. In the dialog, select " Complete_Load.sld " and click Open . The ScreenPRO-II
12. It takes several minutes to load the flash memory. When complete, the Flash
13. Cycle power on the ScreenPRO-II Controller, and exit the Flash Loader utility.
14. On ScreenPRO-II Controller, perform a factory reset. In Chapter 5, refer to the
15. On the ScreenPRO-II Controller, verify that the new software has been loaded
This completes the software upgrade procedure via serial communications.
ScreenPRO-II Controller • User's Guide
To troubleshoot the serial connection:
a.
If the DCD and CTS status lights are green, re-check the communication
settings in the loader, and verify that the COM port and Baud Rate
settings are correct.
b.
To verify ScreenPRO-II Controller communication settings, press
{ HOME } > MISC > { CONSL } to display the Console Port Setup Menu .
c.
Verify the following settings:
Baud rate = 115200
Data Bits = 8
Parity = None
Stop Bits = 1
d.
Repeat steps 7 and 8 above, then re-check the status lights.
e.
With communication status OK, continue with step 10 .
upload ."
Controller menu should immediately display the " System in LOADER MODE "
message.
Loader utility displays the " Upload Complete " message. Click OK to continue.
"
Return to Factory Default
correctly. Press { HOME } > SYSTEM > { SW VER } to display the Software
Version Menu .
`K==réÖê~ÇáåÖ=pçÑíï~êÉ
" section on page 189 for instructions.
Serial Upgrade Method
273

Advertisement

Table of Contents
loading

Table of Contents