Installing the PowerConnect 3524/P and
PowerConnect 3548/P

Site Preparation

The Dell™ PowerConnect™ 3524 /P and PowerConnect 3548/P devices can be mounted in a standard
48.26-am (19-inch) equipment rack, placed on a tabletop or mounted on a wall. Before installing the
unit, verify that the chosen location for installation meets the following site requirements:
Power — The unit is installed near an easily accessible 100-240 VAC, 50-60 Hz outlet.
General — The Redundant Power Supply (RPS) is correctly installed by checking that the LEDs
on the front panel are illuminated.
PoE Models — The RPS is currently installed by checking that the PoE LEDs on the front panel
are illuminated.
Clearance — There is adequate frontal clearance for operator access. Allow clearance for cabling,
power connections, and ventilation.
Cabling — The cabling is routed to avoid sources of electrical noise such as radio transmitters,
broadcast amplifiers, power lines, and fluorescent lighting fixtures.
Ambient Requirements — The ambient unit operating temperature range is 0 to 45ºC (32 to
113ºF) at a relative humidity of 10% to 90%, non-condensing.

Unpacking

Package Contents

While unpacking the device, ensure that the following items are included:
Device/Switch
AC power cable
RS-232 crossover cable
Self-adhesive rubber pads